Defect Completion Revisit or Warranty Visit
from £140.00
Following the Defects having been carried out, we are sure that you would want those new repairs re-inspected on site, with a developer notification follow up included with addendum to the report.
Select our Warranty period survey to include all of the defects in your home before the 2 year builders warranty expires, the builder has no obligation to repair where defects are not raised within the 2 year defects liability (snagging warranty) period.
This is a time limited purchase and well worth validating repairs carried out to suitable standards with specified materials .
Let us do the hard work, and take away some of those hassles.
Number of Bedrooms:
Quantity: